4-minutes summary of Theory of Constraints

Philip Marris summarizes in 4 minutes what Theory of Constraints is

 

A brief 4 minute summary of how one applies the Theory of Constraints in a production environment. It covers: the axiom of the unbalanced plant, the existence of bottleneck, the Drum – Buffer – Rope flow control mechanism and the improvement strategy (the 5 focusing steps).

 

To enhance your experienceMarris Consulting organizes training sessions on Theory Of Constraints.

Training Details and Registration


Share this page :

© Marris Consulting
Who are we?
Contact
Legal notice

Social networks
   

Site
Made by 2exVia
With MasterEdit®